BANANA RIPENING WAREHOUSE

Banana Ripening Warehouse

We supplied LINIA Continuous lighting busbar system as an upgrade and replacement of the existing discharge lamps in this busy banana ripening warehouse.  The project was completed in sections and the building remained in use throughout.

LINIA was chosen for its ability to be installed quickly and easily – paramount in this case where the building needed to remain operational the whole time.  The exceptional efficiency also brought dramatic energy savings.

Gallery

Products Used

VLG-FP

LINIA Projects

GABLER Immobilienverwaltung GmbH & Co KG

GABLER Immobilienverwaltung GmbH & Co KG

Gabler Immobilienverwaltung in Schorndorf provides storage in several large halls for forwarding agencies and other companies.
UCA Epsom

UCA Epsom

Refurbishment of the photography and printroom at the University of Creative Arts Epsom
1FA (Finsbury Avenue) – Category A Fitout

1FA (Finsbury Avenue) – Category A Fitout

Refurbishment of the iconic grade II listed building, originally constructed in the 1980’s by Arup Associates
1 FA (Finsbury Avenue) – Category B Fitout

1 FA (Finsbury Avenue) – Category B Fitout

Category B FitoutCategory B - Fitout LINIA came into its own for the various office Cat B fitouts, including space ...