Pinewood School was the first of a phase of new school designs which featured energy efficient lighting as well as other new standards in energy efficiency. Hampshire County Council adopted this design across several more schools. The results were schools that were pleasing environments to learn in. Specially adapted lighting controls were used to provide ultimate comfort.
Recent Spectral Projects
The Rowe Central House
HALO Bristol
The Bindery
Chivas Brothers Bottling Facility
John Robertson Architects
Products Used

F-Line
Shallow suspended direct indirect luminaire using RIDI Group's easily replaceable R-Tube LED light sources

ALBA
Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens

ALBA Surface
Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens
RIDI Projects

Mission Kitchen
RIDI Group are proud to have contributed towards the Mission Kitchen project in the heart of New Covent Garden market in South London.

The Grafton, Cambridge
RIDI Group and Intoheat came up with a lighting solution using products from the extensive RIDI Group portfolio ...

Eagle House, London
An ambitious project carried out in Holborn district of London where the original 5 storey building was refurbished

The Granville
RIDI Lighting have provided the core lighting to The Granville community Hub in North London. The Granville is a ...