Pinewood School, Fleet, Hampshire

Pinewood School was the first of a phase of new school designs which featured energy efficient lighting as well as other new standards in energy efficiency. Hampshire County Council adopted this design across several more schools. The results were schools that were pleasing environments to learn in. Specially adapted lighting controls were used to provide ultimate comfort.

Recent Spectral Projects

The Rowe Central House

HALO Bristol

The Bindery

Chivas Brothers Bottling Facility

John Robertson Architects

Products Used

F-Line

F-Line

Shallow suspended direct indirect luminaire using RIDI Group's easily replaceable R-Tube LED light sources
ALBA

ALBA

Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens
ALBA Surface

ALBA Surface

Range of LED downlights from 150mm to 400mm diameter with outputs from 1100 to 6000 lumens

RIDI Projects

Pinewood School, Fleet, Hampshire

Pinewood School, Fleet, Hampshire

Pinewood School was the first of a phase of new school designs which featured energy efficient lighting as well as ...
Lord’s Cricket Ground

Lord’s Cricket Ground

Burrell Foley Fischer were the architects to the Contractor, Knight Harwood, for the refurbishment of the ...
Autohaus Fischer, Landau

Autohaus Fischer, Landau

The history of FISCHER Automobiles began over 40 years ago. Today, the company boasts a sales area over 10,000 ...
Invicta Grammar School, Maidstone

Invicta Grammar School, Maidstone

The Izatt building was added to the school as a new purpose-built facility to provide new classrooms and a library.