The tall 9m atrium at the Marylebone HQ of BNPP presented a challenge to the designers on this project. AROS Architects had the vision of lighting the space purely from artificial skylight but also needed to provide a high level of illumination at desk level.
There was also an issue of maintenance that had to be addressed. The NOREA LED system fitted the bill perfectly. With its trim-less design and discreetly integrated ceiling system, an 8×8 grid system was created to give an homogeneous square of light.
With the high performance LED system employed, a level of over 500 lux was achieved at floor level to give impact to the reception space. The LED system will also have a 15 year service life.
Recent Spectral Projects
The Rowe Central House
HALO Bristol
The Bindery
Chivas Brothers Bottling Facility
John Robertson Architects
Products Used
No results found.
Spectral Projects

AHMM Architects
Leading London architects firm, AHMM, wanted to create a feature look for their newly refurbished reception ...

CÁLEM Experience, Porto
Cálem are a historic fine wines brand known for their famous Port. Located in the city of Porto on the south bank ...

Porsche Museum
Stuttgart’s Porsche Museum is a showcase of 80 years of Porsche design. The growing collection of historic vehicles

Christ Church Downend
Bristol, UKChrist Church Downend was constructed in 1836 and is a Grade II listed church. As part of the ...