CEMENT FACTORY

LINIA with its IP rating was chosen for this inhospitable Belgain cement factory.  Selected for its long design life and ease of maintenance, LINIA is also simple to clean with its smooth flat surfaces, making removal of the cement dust a simple regular task.

Gallery

Products Used

VLG-FP

LINIA Projects

Sport Pesa

Sport Pesa

Office refurbishment within Liverpool's iconic Royal Liver building
1FA (Finsbury Avenue) – Category A Fitout

1FA (Finsbury Avenue) – Category A Fitout

Refurbishment of the iconic grade II listed building, originally constructed in the 1980’s by Arup Associates
Schwelhalle, Balingen

Schwelhalle, Balingen

The Schwelhalle (carbonisation hall) located in the Frommern district of the German town of Balingen looks back on a long history.
00 Architecture

00 Architecture

Architecture 00 have recently moved into their new studios in Mare Street, Hackney.